Scaffold in accordance with the building facade
setting state is divided into 4 standard forms such as the floor sort,
cantilever, hanging, adherent lifting.
(1) The floor typed Kwikstage
Scaffold erected around the ground outdoors
of a developing, the main erection strategy will be the set-up of vertical pole
double row. Due to vertical rod bearing capacity limit, combined with all the
huge amount of material consumption and long holding time, so, the Scaffold is extremely
controlled beneath 40 m. Inside the construction of brick concrete framed
houses, the Scaffold
is used for building, decoration and protection; within the building of
multilayer frame structure, the Scaffold is mostly employed for decoration and protection.
(2)The cantilever Scaffold is erected on the overhanging
structure extending outward around the outer edge from the constructing,
passing all or a part of the Scaffold
load for the structure. You'll find two types of key types for the cantilever
supporting structure which includes the strut-framed structure with the triangle
truss with the steel welding production along with the cable-stayed structure
in the horizontal steel cantilever beam pulling oblique using the steel wire
rope. Double exclusive Scaffold
erected around the cantilever structure may be the identical because the floor
typed Kwikstage
Scaffold, the
height of your segmental cantilever Scaffold is frequently controlled within 25 m. This kind of Scaffolding is for
decoration and protection, applied in the high-rise construction requiring
completely enclosed in the downtown location, in case of falling objects.
Though the Scaffold is set-up with all the progress with the
project, it will likely be demolished when the project is completed. On the
other hand, it includes a direct effect around the building speed and efficiency,
engineering excellent and safety in the workers. When the Kwikstage
Scaffold is not erected
in time, it can delay the progress of the project; the erected Scaffold will not conform
towards the construction needs, the workers operation is not easy, so the good
quality is not assured, efficiency cannot be enhanced; in the event the Scaffold is weak and
unstable, it truly is probably to result in deaths and injuries in
construction. The variables on the Scaffold choice, structure, erection, quality and so on, need to
not be careless and sloppy, for the reason that it plays a too vital role in
the construction.
Erecting the Scaffold is for security, it might expense greater
than we imagined, but don't forget life is priceless.